Borrower record · Q2 2026
Sunk Rock Foundry Partners LP, Hatteras Electrical Manufacturing Holding Company and Sigma Electric Manufacturing
As filed by Ares Capital Corporation · period end 30 June 2026No sector — one filer, nothing to corroborate1 name variant under review
Ares Capital Corporation is the only BDC lending to Sunk Rock Foundry Partners LP, Hatteras Electrical Manufacturing Holding Company and Sigma Electric Manufacturing: $22.4m across four positions at Q2 2026, marked at par. All of it comes due inside two years — the last tranche in December 2027.
- Filed fair value
- $22.4m
- 4 funded positions
- Aggregate mark
- 100.0c
- cost filed on all 4 positions
- Median spread
- 575bp
- over SOFR, 4 tranches
- Maturities to
- 2027
- one date, 1 December 2027
- Periods on record
- 5
- Q2 2025 → Q2 2026
How this total is counted
- Every figure above is the sum of 4 funded positions filed by Ares Capital Corporation, each one cited below.
- Counted from the Q2 2026 filings imported for this build, the latest of them filed 20 August 2026. A schedule filed after that date is not in these figures and will appear when the property is rebuilt.
- 1 filed name variant is under review against this borrower. Until it is resolved, anything filed under that name is counted nowhere on this page.
Pricing as filed
4 floating tranches · SOFR575bp on all 4 floating tranches — every filer reports the same spread.
Capital structure
First-Lien Senior Secured, on all 4 positions whose seniority a filer disclosed.
Rate structure
Floating, on all 4 positions whose interest type a filer disclosed.
Maturity profile
all 4 funded positions dated1.4 years to maturity, weighted by fair value across the 4 dated positions.
Filed over time
5 periods · aggregate onlyFiled fair value
Aggregate marknot to zero
Q2 2025, Q3 2025, Q4 2025, Q1 2026, Q2 2026 — every filer reporting the borrower at each period, aggregated. No lender is separated out at any period.
Credit flags
The filer reports no position on non-accrual, and no filed tranche pays in kind.
Not in the filings
- No sector, and there cannot be one: the test needs two filers to agree and only one filed a label.
- No index floor filed on any tranche.
Sign up for free
Tell me when this changes.
One lender reports Sunk Rock Foundry Partners LP, Hatteras Electrical Manufacturing Holding Company and Sigma Electric Manufacturing today. We will email you when a second one does, when Ares Capital Corporation's mark moves, or when the position leaves the schedule.
- A second BDC reports this borrower
- The filed mark moves by more than two cents
- A position goes on non-accrual or starts paying in kind
- The borrower drops out of the schedule entirely
Every filing behind this page
1 filer · Q2 2026| Filer | CIK | Form | Period | Filed | Accession |
|---|---|---|---|---|---|
| Ares Capital Corporation (ARCC) | 0001287750 | 10-Q | 2026-06-30 | 2026-07-29 | 0001628280-26-050307 |
Related borrowers
Same lender