Borrower record · Q2 2026
Center Phase Energy
As filed by Franklin BSP Capital Corp · period end 30 June 2026No sector — one filer, nothing to corroborate1 name variant under review
Franklin BSP Capital Corp is the only BDC lending to Center Phase Energy: $28.5m across four positions at Q2 2026, marked at 104.4 cents. All of it comes due inside two years — the last tranche in June 2027.
- Filed fair value
- $28.5m
- 4 funded positions
- Aggregate mark
- 104.4c
- cost filed on all 4 positions
- Maturities to
- 2027
- one date, 23 June 2027
- Periods on record
- 3
- Q4 2025 → Q2 2026
How this total is counted
- Every figure above is the sum of 4 funded positions filed by Franklin BSP Capital Corp, each one cited below.
- Counted from the Q2 2026 filings imported for this build, the latest of them filed 20 August 2026. A schedule filed after that date is not in these figures and will appear when the property is rebuilt.
- 1 filed name variant is under review against this borrower. Until it is resolved, anything filed under that name is counted nowhere on this page.
Pricing as filed
2 floating tranches · SOFR600bp on all 2 floating tranches — every filer reports the same spread.
Capital structure
All 4 funded positions carry a filed seniority.
Rate structure
Floating, on all 2 positions whose interest type a filer disclosed.
2 of 4 funded positions carry no filed interest type.
Maturity profile
2 of 4 funded positions dated1.0 years to maturity, weighted by fair value across the 2 dated positions.
Filed over time
3 periods · aggregate onlyFiled fair value
Aggregate marknot to zero
Q4 2025, Q1 2026, Q2 2026 — every filer reporting the borrower at each period, aggregated. No lender is separated out at any period.
Credit flags
The filer reports no position on non-accrual, and no filed tranche pays in kind.
Not in the filings
- No sector, and there cannot be one: the test needs two filers to agree and only one filed a label.
- No maturity on 2 of 4 funded positions. Undated is left undated, not assumed.
- No index floor filed on any tranche.
Sign up for free
Tell me when this changes.
One lender reports Center Phase Energy today. We will email you when a second one does, when Franklin BSP Capital Corp's mark moves, or when the position leaves the schedule.
- A second BDC reports this borrower
- The filed mark moves by more than two cents
- A position goes on non-accrual or starts paying in kind
- The borrower drops out of the schedule entirely
Every filing behind this page
1 filer · Q2 2026| Filer | CIK | Form | Period | Filed | Accession |
|---|---|---|---|---|---|
| Franklin BSP Capital Corp (FRBP) | 0001825248 | 10-Q | 2026-06-30 | 2026-08-12 | 0001825248-26-000024 |
Related borrowers
Same lender